Remember the BUS from Speed movie that jumps the huge gap of an imcomplete bridge.
Lack of Sign Boards, has led a driver to take an under construction bridge, unaware that there is a huge gap in the middle which is exactly above the railway tracks.
Lucky that no train passed during that moment.The frequency of these electric trains is almost one for every three minutes during peak time. It concludes that even local train commutation is risky because such collisions will impact hundreds of train passengers as well due to sudden breaks / derail (offcource it is one off situation, but still it counts, because I am seeing the slow progress of the construction of this bridge for the past 5 to 6 years atleast ).
SUV takes flyover, lands on rail track
Lack of Sign Boards, has led a driver to take an under construction bridge, unaware that there is a huge gap in the middle which is exactly above the railway tracks.
Lucky that no train passed during that moment.The frequency of these electric trains is almost one for every three minutes during peak time. It concludes that even local train commutation is risky because such collisions will impact hundreds of train passengers as well due to sudden breaks / derail (offcource it is one off situation, but still it counts, because I am seeing the slow progress of the construction of this bridge for the past 5 to 6 years atleast ).
SUV takes flyover, lands on rail track
Attachments
Last edited: